small building history Bergstraße 4

29.06.2008Day of Architecture 2008:
A group of interested persons viewing at the building.
29.06.2008Day of Architecture 2008:
Landscape architect Rainer Ihle and the architects Corina Krug and Silvia Reichel explaining their ideas.
29.06.2008Day of Architecture 2008:
A view throught the staircase at the east façade to Dresden Main Station.
24.06.2008Steel workers during the installation of the staircase at the west façade.
03.06.2008A view at the west façade with greenland in the foreground.
25.04.2008Breaktime and meeting area.
01.04.2008Evening atmosphere: A view at the east façade.
14.03.2008A view at the west façade.
09.03.2008Installation at the roof of the building.
09.03.2008A view at Dresden Main Station.
09.03.2008A view from south east direction with the so called "Holzmann-Bau" in the background - see photo from 07.05.2004.
28.02.2008A view at the west façade, now it is plastered too.
28.02.2008Evening atmosphere: A view from the diriction of Dresden Main station.
20.02.2008After cultural part discussions were going on.
20.02.2008Opening ceremony:
Discussions between guests and DMOS employees.
20.02.2008Opening ceremony:
After the official part of the party the guests clink glasses of sekt.
20.02.2008Opening ceremony:
Congratulations from the major for trade and industry of Dresden, Dirk Hilbert.
20.02.2008Day of the opening ceremony: Very nice weather.
07.02.2008The forecourt with the round flowerbed is prepared by an outside worker.
05.02.2008The forecourt near the main entry is under preparation.
30.01.2008 The chimney is put up in front of the gate to the underground car park.
30.01.2008 A DMOS employee is supervising the transpotation.
30.01.2008 The chimney is manoeuvred with two cranes to the west façade.
30.01.2008 The new chimney is arrived. It is one piece with a length of 18.60 m.
22.01.2008 The drilling work for the new chimney is ongoing.
19.01.2008 Still some packaging material is in the offices but we are "online" and ready to work.
18.01.2008 The base plate of the shaft is installed.
18.01.2008 The meeting room in the 2nd floor with spartan furniture.
18.01.2008 The first desks are ready to work in the afternoon.
18.01.2008 We are moving. A discussion during reinstallation of office furniture and computers.
18.01.2008 The foot point of the chimney's shaft is reached.
17.01.2008 The floor covering in the 2nd basement is ready; a view in east direction.
10.01.2008 The underground car park is ready for use.
10.01.2008 A 1st lightning test in the meeting rooms at the east façade.
09.01.2008 The first part of the laboratory equipment is moved from the office in the Tannenstraße to evaluate first samples of a new ASIC.
09.01.2008 The ESD floor in the 2nd basement is put down.
08.01.2008 At the west side the installation of the shaft for the chimney has started.
05.01.2008 In the 1st and 2nd floor the construction for the false ceiling is prepared.
03.01.2008 The 2nd basement was dried for some weeks and is now ready for the preparation of the stone floor.
21.12.2007 Now the site is prepared for get ready of the green space.
21.12.2007 Architect Silvia Reichel, site manager Tino Hauser and the manager of the sealing company Eckhardt Paul on the roof inspecting the sealing at the north part.
14.12.2007 Here you can have a look throught the office doors in the first floor.
14.12.2007 A view at the heating system, but not yet working because the chimney is not installed.
13.12.2007 First laboratory tables were delivered and built up in our application area.
07.12.2007 And so you can see the main station with the towers of the churches Frauenkirche and Kreuzkirche in the background..
07.12.2007 So you see our new building if you com from the main station.
07.12.2007 The meeting and breaktime area in the 2nd floor is prepared for the installation of the false ceiling.
06.12.2007 The scaffold at the north façade have been taken down.
03.12.2007 Architect Corina Krug, company site manager Frank Wuschik and site manager Tino Hauser during the final inspection of the north façade.
30.11.2007 The covering of the brim of the roof is started.
27.11.2007 A view in the underground car park.
26.11.2007 The north façade is prepared for the final inspection.
20.11.2007 A view at staircase 1 before the north façade is plastered.
20.11.2007 The covering of the carpet has started. Architect Silvia Reichel discusses with landscape architect Rainer Ihle about the outdoor installation.
18.11.2007 A view from staircase 2 in the meeting and breaktime area.
18.11.2007 The 2nd floor is prepared for covering the fitted carpet.
13.11.2007 A view at staircase 1 in the evening.
13.11.2013 Two workers are mounting the  glass doors at the 2nd floor.
11.11.2007 The scaffolds at the south and east façade have been taken down.
08.11.2007 The sealing of the ground in the underground car park is done.
07.11.2007 The first steps of staircase 2 are ready.
06.11.2007 First measurement results give cause of optimism and were confirmed in a detailed measurement report.
06.11.2007 Architect Silvia Reichel with the noise prevention experts Heiko Schierz and Mario Gutbier in preparation of the noise measurement of new developed integrated overflow elements.
06.11.2007 The put down of the floor covering in the west staircase has started.
03.11.2007 A view from the terrace to the main station with a part of the roof in the foreground.
01.11.2007 The south façade is nearly ready.
30.10.2007 The doors for the testequipment are in preparation for installation.
27.10.2007 The mounting of the vestibul has started.
25.10.2007 Preparation for covering  the brim of the roof.
20.10.2007 The east and south façade in rainy weather.
19.10.2007 A view at the stone pit of Theuma in Vogtland (South of Saxony) from where we will get the floor covering of our foyer and stairs.
18.10.2007 Preparation of the stone floor in stair case no. 1.
18.10.2007 The road to the underground car park is ready.
18.10.2007 The road to the underground car park is in preparation.
18.10.2007 The sun shines at the east façade of our building.
16.10.2007 The east façade from an viepoint at north east.
16.10.2007 The east façade after roughcasting.
14.10.2007 The east façade is prepared for  roughcasting.
14.10.2007 A view from the scaffolding at the south façade.
14.10.2007 The false bottom at the south of the base floor is closed and ready for dry wall construction.
14.10.2007 The road to the underground car park is in preparation. for asphalt.
09.10.2007 A view at the place in front of our building.
09.10.2007 Door frames are mounted in the 2nd floor.
01.10.2007 A trial piece of roughcast is prepared at the east façade.
01.10.2007 The east and south façades are prepared for roughcasting.
01.10.2007 Reinforcement at the south façade.
26.09.2007 Visiting the building site: DMOS manager Holger Jung, ELMOS Engineering Director Ludger Krücke and ELMOS Sales Director Gerhard Szodrak.
13.09.2007 A worker is cleaning the bare boards for mounting the false bottom at the base floor.
11.09.2007 Up to now the underground car park is used as a store.
09.09.2007 A view at the roof terrace at the west side.
05.09.2007 ... and in the north part of the 1st floor.
04.09.2007 An first impression of the future offices at the south part in the 1st floor.
29.08.2007 A view up in the staircase at north east.
29.08.2007 A view in east direction with north and parts of the west façade.
28.08.2007 Insulation material is sticked at the north façade.
28.08.2007 Workers dam up the ceiling of the underground car park.
25.08.2007 Now the west façade is closed.
24.08.2007 Now the east façade is closed , except the main entrance door.
24.08.2007 The false bottom at the south of the 1st floor is closed and ready for dry wall construction.
18.08.2007 While checking the mounting hights of false bottom and a wall profile.
16.08.2007 The false bottom in the corridor of the 2nd floor is closed.
14.08.2007 A first sampling of the floor covering.
14.08.2007 The goods lift is demounted.
09.08.2007 ELMOS CTO Dr. Frank Rottmann, ELMOS Engineering Director Ludger Krücke, ELMOS CFO Nicolaus Graf von Luckner, DMOS Manager Holger Jung and the ELMOS  initiator of this building Bernd Engler are visiting the new building to get an impression about the status of the construction.
07.08.2007 The cabine of the elevator - a view at the back side.
05.08.2007 A view under the false bottom.
05.08.2007 A view at the east façade - a view from Dresden main station.
05.08.2007 A redtail used a windowsill as nesting place while the façade was not fully closed.
31.07.2007 A worker is mounting a glass element at the east façade.
31.07.2007 A view in east direction - during the mounting of the façade.
30.07.2007 A view at the east façade.
30.07.2007 The south façade is completely closed.
26.07.2007 Mounting of elements at the west façade.
26.07.2007 A special vehicle named Manitou is used to mount large glass façade elements.
25.07.2007 False bottom erection in the 1st floor - view from west to east.
24.07.2007 False bottom erection in the 1st floor - view from east to west.
24.07.2007 A view in north east direction over the city center.
24.07.2007 Insulation and sealing at the roof terrace are in progress.
24.07.2007 A view over the roof in south east direction.
21.07.2007 The room for the heating system is ready for installation.
21.07.2007 Heating, water and ventilation  tubes between the floors are mounted.
21.07.2007 Preparation for insulation and sealing at the roof terrace.
17.07.2007 A view in an office in the ground floor, still without false bottom.
13.07.2007 At the ground floor: all windows are mounted.
13.07.2007 A view at the south side of  top floor - the scaffold is partly took down.
13.07.2007 The west façade with first windows mounted.
10.07.2007 Here you have a view from the north western neiborhood to our building.
06.07.2007 A total view with the dominant staircase #1.
06.07.2007 At the 2nd basement, the ceiling of the ventilation center room is insulated.
06.07.2007 A view down at the façade of staircase #1  - north - east side.
06.07.2007 At the top: Split engine for air condition is mounted and the roof is prepared for planting of grass in autumn.
03.07.2007 A view through the window in staircase #1.
03.07.2007 (2) ... and thread at the north part of the façade.
03.07.2007 (1) A window element for staircase #1 is lifted at the east side.. 
03.07.2007 Mirroring in the façade of the north side.
01.07.2007 A view at the south side of  top floor.
01.07.2007 First impression of our new secretary's office.
26.06.2007 A view at Dresden main station from the roof of our building: Just before a thunder storm.
26.06.2007 ...here you see the back side from the opposite room.
26.06.2007 First inter office walls are mounted.
25.06.2007 The window wall at the south in the 1st floor of our building is assembled.
20.06.2007 Floating floor in EMC laboratory in the 2nd basement is settling.
20.06.2007 Staircase #1: A view down the stairs.
20.06.2007 Staircase #1: A view up the stairs  to the 2nd basement.
19.06.2007 The preparation for the floating floor in the 2nd basement is afoot.
17.06.2007 Façade elements on the north side of the top floor are lying in the evening sun.
14.06.2007 The south façade of the top floor is under installation.

14.06.2007 The façade construction of the 1st staircase is installed.
10.06.2007 All façade elements are mounted at the south side in the 1st floor.
08.06.2007 A façade element is mounted at the south side in the 1st floor (4).
08.06.2007 A façade element is mounted at the south side in the 1st floor (3).
08.06.2007 A façade element is mounted at the south side in the 1st floor (2).
08.06.2007 A façade element is mounted at the south side in the 1st floor (1).
07.06.2007 Façade elements are stored at the forecourt of our new building. Because of the sunny wheather there is no problem.
05.06.2007 First parts of the banisters in staircase #1, north west side, are mounted.

04.06.2007 2nd floor: The mounting of the façade elements at the south side of our building has been started.
04.06.2007 The mounting of façade elements at the north side has been started too.
04.06.2007 A detail of a window element.
31.05.2007 A view cross the roof in western direction.
31.05.2007 Vent pipes are mounted in the 3rd floor.
28.05.2007 The shingle for the planting of grass on the roof is prepared.
28.05.2007 After a rainy night we had water in the 1st floor.
22.05.2007 Three workers are mounting parts of the staircase façade at the north side.
18.05.2007 A postcard view: our building with the "Holzmann-Bau".
18.05.2007 The toolset for the façade mounting.
15.05.2007 A view at the scaffolded façade of the south side.
12.05.2007 The architect is checking the preparation for the mounting of the façade.
08.05.2007 2nd floor - a view at the south façade from the inner side.
08.05.2007 Plasterers working on the ceiling of  the 1st floor.
25.04.2006 A view out of staircase #1 to the  railway station.
21.04.2006 The façade at the west side gleams in the evening sun light.
21.04.2006 The walls in the 2nd basement are plastered.
04.04.2006 The pedestal for the conditioning device is prepared on the roof.
30.03.2006 A nightmare for every building owner. An additional ceiling cut for air conditioning has to be made after shell acceptance.
20.02.2006 The tooling of the gutter is complete. Strong rain will never become a problem.
20.02.2006 A view over the gutter to the railway station.
09.02.2006 Our building is structurally complete. Façade and indoor completion are following.
09.02.2006 This year we have a  mild winter in Dresden. It seems we can start the planting of grass on the roof very soon.
08.12.2006 The day of shell acceptance.
The site managers R. Wehser and T. Hauser assist the project controller during his first drive in the underground car park.
08.12.2006 The day of shell acceptance.
The project controller R. Wozniak, the foreman T. Rjeschni, the structural engineer G. Bochmann and the site manager T. Hauser in discussion.
08.12.2006 The day of shell acceptance.
The project controller R. Wozniak inspecting the concrete at the wall of staircase 2.
30.11.2006 Here you have a view to the eastern front of the building - without the crane.
30.11.2006 The sealing of the roof is in progress.
19.11.2006 Autumn impression with a view through a window in the 2nd floor.
19.11.2006 Here you have a look at the 2nd floor westwards.
19.11.2006 The crane will be taken apart at November, 24. So we used the last possibility to get an overview.
19.11.2006 Here you can see the autumn colors in the neighborhood - indian summer in Dresden.
19.11.2006 A view to another building site, the main station.
19.11.2006 A view from the crane to the east part of the building site.
15.11.2006 Completion of the 1st floor, a view eastwards.
15.11.2006 View via the roof in westward direction with the Holzmann building at the righthand side.
08.11.2006 The road to the underground car park is under preparation.
08.11.2006 The wooden roof is under construction. Because of rainy weather the carpenters work was sometimes very hard.
02.11.2006 The curve at the underground car park with the power service in a prefabricated concrete part.
31.10.2006 The wooden roof is under construction. In the background you can see the main station and the towers of the Churches Kreuzkirche and Frauenkirche.
31.10.2006 There are the three important nails with their (still) glossy heads.
26.10.2006 topping-out ceremony:
Managing director Holger Jung and DMOS associate Prof. Dieter Landgraf-Dietz in discussion with  ELMOS' personnel manager Bernd Engler. He was the initiator of the new building.
26.10.2006 topping-out ceremony:
The carpenter Mr. Bartneck giving his speech with site manager Tino Hauser, Bernd Engler from ELMOS AG, Holger Jung and Mario Reichel from DMOS on the scaffolding.
26.10.2006 topping-out ceremony:
All those involved in the building of the house, DMOS employees and guests in discussion before having a snack on the groundfloor.
25.10.2006 Site manager Tino Hauser giving his last directions to the carpenters on the 3rd floor.
12.10.2006 A view from the west side of the 3rd floor to the main station.
08.10.2006 A view from the crane to the western part of the building.
08.10.2006 A view in south east direction to the mountains of the "Saxonian Switzerland", with the church of Strehlen in the foreground.
08.10.2006 A view to the churches Frauenkirche and Kreuzkirche with the former department store "Centrum Warenhaus", built in the 70s.
06.10.2006 A view from the crane over the building site. The eastern part is already concreted while wick workers prepare the western part.
06.10.2006 The preparation of the road to the underground car park has been started. A view to main station.
29.09.2006 View in eastern direction to the main station. The ceiling of the 2nd floor is ready for concrete.
29.09.2006 A view from the cranes jib down to the building site. Wick workers at the ceiling of the 2nd floor.
29.09.2006 View over Dresden in north direction in the evening with main station in the foreground.
29.09.2006 View to the city center with the tower of the residence palace, the towers of the churches Hofkirche, Frauenkirche and Kreuzkirche and the town hall tower.
29.09.2006 View in south direction to  the campus of the Technical University with the tower of the Georg-Schumann-Bau, a historical building, in the center of the photo.
22.09.2006 A view in western direction. Only one floor is left before completion of the shell.
20.09.2006 The crane transports concrete while another machine pulls an obstruction beam at the north-west corner of our building site.
13.09.2006 The demounting of the fence to the neighbour has started. In a few days the preparation of the road to the underground car park will be started.  In the foreground the west sided staircaseis under construction.
10.09.2006 A view to the eastern front of the building. The main entry at this façade is under preparation.
10.09.2006 A view outside the future meeting room of the 1st floor.
08.09.2006 Wickworkers do their job at the ceiling of the 1st floor.
06.09.2006 The completion of the ground floor is started, a view in south-eastern direction.
06.09.2006 The crane transports elements for the thermally activated concrete in the roof of the 1st floor.
04.09.2006 Preparation for concrete in the 1st floor, with Dresden main station in the background.
23.08.2006
The outer walls of the groundfloor are ready.
20.08.2006
A view in eastern direction with the railway station in the background. Right in front there is the ceiling of the drive to the underground car park and at the left there will be our test and evaluation area.
20.08.2006
Staircase #1 is growing.
20.08.2006
In the underground car park.
20.08.2006
The eastern part of the ceiling over the ground floor is concreted.
16.08.2006
The ceiling of the drive to the underground car park is still in preparation.
10.08.2006
Wickwork preparation at the drive to the underground car park. In the background the ceiling is already armoured.
09.08.2006
Behind the dominant building sign the groundfloor is growing.
09.08.2006
The groundfloor is under construction. In the foreground you can see  the staircase #2.
On the left the machine that looks like a crane is lifting the obstruction girders.
02.08.2006
Now we are at the ground floor, out of the construction pit.
02.08.2006
The outer wall of the drive of the underground car park is in preparation.
26.07.2006
Up to now my Nikon D200 camera made a good job. Unfortunately it was stolen in the night from July 26th to 27th. I did not download the last fotos from July 26th.
By the way the device number of my camera is 4034943.
22.07.2006
An evening view out of the future underground car park drive.
21.07.2006
Facing the shutters of the drive's wall, you see a wickworker preparing the armour for its foundation.
21.07.2006
The layer over the eastern part of the underground car park is ready. It is now used for the material depot.
18.07.2006
OBAG employees shutter the inner wall of the drive of the underground car park.
12.07.2006
Two wickworkers on the layer above the underground car park.

12.07.2006
The eastern part of the layer above the underground car park is prepared for concrete.
05.07.2006
The walls of the underground car park are under construction.
05.07.2006
THe excavation pit is already filled again below the drive to the underground car park.
30.06.2006
The first concrete layer is complete.
28.06.2006
The wickwork at the western part of the ceiling on top of the 2nd basement is ready for concrete.
26.06.2006
Eastward view with Dresden main station in the background.
26.06.2006
View to the north-west. In the foreground the jib of the telebelt.
26.06.2006
The telebelt, a special-purpose vehicle equipped to fill the area between the construction pit and the wall of the building with soil, in action.
23.06.2006
View into the construction pit. The top of the eastern part is complete, while the western part is in preparation.
23.06.2006
View in eastern direction at the level of the underground car park.
20.06.2006
Visitors from ELMOS  Dortmund: Bernd Engler, authorized signatory (right) Dr. Frank Rottmann, member of the board (2nd from left), and Ludger Krücke (left), head of development, with DMOS associate Prof. Dieter Landgraf-Dietz.
20.06.2006
Bernd Engler, Prof. Dieter Landgraf-Dietz, Frank Rottmann and Ludger Krücke (from left to right) inspect the excavation pit.
20.06.2006
Just on time during the inspection, the construction of the ceiling's eastern part above  the 2nd basement is started.
14.06.2006
The inner walls in the 2nd basement are under construction. On the north side, single rooms can already be identified. At the east part of the building preparations for the construction of the ceiling are in progress.
14.06.2006
The walls to shore up the access to the underground parking area are armoured now.
11.06.2006
All outer walls of the 2nd basement are set up. Now the inner walls are under construction.
11.06.2006
The construction of the inner walls has been started. View to the east with the railway station in the background.
11.06.2006
View from a spot in the corridor of the 2nd basement, looking east.
11.06.2006
Working space between the outer wall and the wall of the construction pit. View in northern direction with a corner of the "Holzmann-Bau".
07.06.2006
The outer walls in the 2nd  basement are allmost complete.  Pillars and first inner walls are being set up.
07.06.2006
Only in the access area of the underground park the walls are still missing.
31.05.2006
First parts of the outer walls are ready, while some are still being prepared.
31.05.2006
Meeting of planning council in a container on the building site.
29.05.2006
ELMOS' CEO Dr. Anton Mindl and the members of the board Dr. Klaus Weyer and Reinhard Senf use their remaining time during a Dresden visit to take a look at the building site. They are amazed because of its size. ELMOS secures the financing of the construction project by its comissions for ASIC designs and is standing surety for several million Euro.

Funnily, AMD announced today that they want to invest 2.5 billion US$ into their two factories in Dresden-Wilschdorf during the next years.
pict 58
24.05.2006
View from the southwestern corner into the construction pit.  The walls of the second understorey are being prepared.
pict 55
24.05.2006
Construction workers are preparing a part of the southern wall of the future basement.
pict 56
24.05.2006
View from the roof of the neighbouring building into the constuction pit.
pict 57
22.05.2006
Two days later. The concrete layer is almost dry and ready for putting up the first walls.
pict 54
20.05.2006
Evening atmosphere, a short time before a thunderstorm.
In the background there is the Main Railway Station.
The 80 cm concrete layer is protected by a thin film of water and has now time to set and harden.
pict 53
20.05.2006
After approx. seven hours of hard work, the eastern part of the foundation is nearly finished.
pict 50
20.05.2006
View of the building site at 1 pm.
pict 51
20.05.2006
The last task was laying  the foundation for the ramp to the underground car park.
pict 52
15.05.2006
Building site from  Bergstraße. The 2nd layer of armour is nearly ready.
pict 48
15.05.2006
A wickworker doing his job.
pict 49
10.05.2006
View to the east with the main station in the background.
The first armour layer is complete. Now the first drains are being layed.
pict 46
10.05.2006
View into the building pit in western direction. On the right the preparation for the lift shaft can be seen.
pict 47
05.05.2006
Foundation Stone Ceremony
On 5th May 2006 the symbolic foundation stone for the new DMOS development and office building was layed. DMOS employees, representatives of Saxony and Dresden, neighbours, project team  and construction companies as well as members of ELMOS AG and former colleagues took part.
Despite the long and hard winter the foundation stone was layed two weeks ahead of plan.
pict 42
05.05.2006
Foundation Stone Ceremony
Ludger Krücke, head of development of the ELMOS AG, pesently making his three symbolic hammer blows, was assisted by Mr. Christoph Themm from the leasing company DAL and DMOS managers Holger Jung and Mario Reichel.
pict 43
05.05.2006
Foundation Stone Ceremony
A view into the lobby of the neighbouring "Holzmann-Bau" while everyone was having a snack and a chat afterwards.
pict 44
05.05.2006
Foundation Stone Ceremony
Relaxed smiles of the architects Silvia Reichel and Corina Krug and the construction supervisor Tino Hauser with the manager of the "Ostsächsische Baugesellschaft" and his some of his employees in the background.

pict 45
03.05.2006

The first layer of armour for the foundation has been layed. From now on the building will continually increase in height.
pict 41
03.05.2006

After the first meeting of the planning council at the building site.
pict 40
29.04.2006
The construction crane is set up.
pict 39
29.04.2006
The first layer of concrete is already finished. Shell construction has started.

pict 38
24.04.2006
The construction pit is completely empty. Even the excavators of last week vanished like ghosts.

pict 37
24.04.2006
The company constructing the shell is taking over.

pict 36
19.04.2006
The ramp has been allmost fully shovelled away. THose will be the last activities of the excavators.
pict 35
19.04.2006

This 60-meter-track is our contribution to the next Olympic Summer Games.

pict 34
16.04.2006
First preparation for the elevator are being made - the small depression in the right foreground. pict 33
16.04.2006


Easter Sunday - two excavators in the construction pit and a third one outside.
pict 32
12.04.2006
We sponsor a new 60-meter-track for our neighbours, the two schools in the west. Part of the old track is now used for the containers and building materials or machines.
pict 31
12.04.2006
Up to now, the big yellow excavator is still inside the pit. pict 30
12.04.2006
Progress being undeniable, the digging comes more and more to an end. You can get an impression with the following snapshots.
pict 29
07.04.2006
The deconstruction of the ramp has started.
pict 28
07.04.2006
The rear part of the construction pit is already swept clean.
pict 27
04.04.2006
View in westward direction. The containers for the building workers can be seen in the background.
pict 26
04.04.2006
The spring flood of the Elbe in 2006 has reached its zenith in Dresden with 7.48 m. But our construction pit stays dry.
pict 25
04.04.2006
The soil color has changed: sand from the banks of the Elbe river.

pict 24
31.03.2006
An eastward view to the railway station. The "Holzmann-Bau" is on the left.
pict 23
31.03.2006
A view from the northern rim into the construction pit. A second row of anchors has been prepared, as can bee seen in the western wall (right). The anchoring machine, having fullfilled its task, has been taken away again.
pict 22
31.03.2006
 The construction pit gets deeper and deeper. Another view in north-westerly direction. pict 21
20.03.2006
The west wall of the construction pit, looking south to the kindergarten. The children are very excited about the goings-on at the building site.
pict 20
20.03.2006
The southern wall of the construction pit. To the left  the place for the construction crane is already in preparation, but currently still in use for a container.
pict 19
20.03.2006
Another view to the north-west ...
pict 18
16.03.2006
A different situation outside the construction pit: allmost 20 cm of fresh snow take a few days to melt.

pict 17
16.03.2006
Snow again last night. But thanks to the worker's speed the snow did not settle in the building pit. To the left you see part of the anchoring machine. The anchors are needed to stabilize the building pit's walls by fixing them to the soil.
pict 16
08.03.2006
Women's day - photo through the fence in north-westn direction.
pict 15
08.03.2006
View in westward direction. There is the "Holzmann-Bau" behind the fence on the right. In the background you see the place where the containers for workers and staff will be put up.
pict 14
03.03.2006
The construction pit is still not so deep. pict 13
03.03.2006
In the background you see the railway station, currently also under construction. The left part visible in the pictur will later become the supplies road for the site. In the foreground, planks are inserted between the iron pillars to keep the sides of the pit from caving in.
pict 12
27.02.2006
Though sunny, relics of snow are still visible. In this year, winter leaves Dresden at the end of March. But the nights are not as cold in the city center as atop the slopes that mark off the Elbe river valley.
pict 11
23.02.2006
The pillars to support the northern wall of the pit  are set. Thus, the construction pit gets its form. But as yet, we have no idea how deep it will become.

pict 10
23.02.2006
The building sign is installed. pict 9
13.06.2005
Nothing is to be seen up to now. But  the all the legal requirements are fullfilled and every preparation is made.
pict 8
13.06.2005
A view from the west (rear of the building site), which is occupied by two schools. Some of the trees near the border will survive.
pict 7
11.05.2005
The green of spring.
pict 6
11.05.2005
View from the roof of the house next door. Our other neighbour will be a  kindergarten (right side in the background). Bild 5
07.05.2004
Of course, we can! Bild3a
06.05.2004
Can anybody imagine a new building here?
Bild 3
06.05.2004
Attempt to approach.
Bild 2
16.04.2004
First contact
Bild 1